Transformation Wk12, Part III
Posted October 21st, 2007 by ShaneB
Saturday afternoon and evening a second and third coat was put in hallways.

The door frames were painted last night. This shot was taken Sunday and on the left the difference in colour can be seen on the door Pati is painting. Credit goes to Mr. David for spending the day postering, then breathing in the fumes painting the door frames until 1.30 in the morning!

Finished lower level hallway.

Mark just doing the cutting - the edges.

Finished archway.

Finished hallway.

Its looking great and feels totally different.
- Shane's blog
- Login or register to post comments
- 220 reads
- Email this page





